2004-2008 7272 Sherbrooke St. New Wing, Atrium, Theatre

Title

2004-2008 7272 Sherbrooke St. New Wing, Atrium, Theatre

Description

In 2000 Loyola High School launched the “Reaching New Heights” Building Campaign to fund the construction of a three-story wing, housing fourteen classrooms, enabling the school to lower class sizes. The classrooms, equipped with cutting-edge technology, will allow students to optimize their learning environment.
The space between the existing building and the new wing is an enclosed Atrium. Below the Atrium is a fully equipped Wrestling Room, a Weight Room and Storage.
The 800 seat Theatre will be used for school assemblies and liturgies as well as providing a space for the drama and music students to showcase their talents.

Items in the 2004-2008 7272 Sherbrooke St. New Wing, Atrium, Theatre Collection

March 2004, New Wing Construction, Loyola High School
Construction begins on the three-story new wing, view facing south from Sherbrooke Street.

May 2004, Atrium Construction, Loyola High School
Atrium construction begins. On the left is the existing high school building.

June 2004, Construction, Loyola High School
Interior construction of Atrium

June 2004, New Wing Construction, Loyola High School
Three-story construction of new wing classrooms, facing West Broadway.

June 2004, New Wing Construction, Loyola High School
View looking toward Sherbrooke St., existing building in background, three-story new wing in foreground.

June 2004, Construction, Loyola High School
Construction on West Broadway entrance to Atrium, classrooms and Theatre

September 2004, Construction, Loyola High School
Interior view of Atrium and new wing classroom corridors

September 2004, Construction, Loyola High School
Construction nears completion on exterior of three-story classroom addition.

Winter 2005, Atrium, Loyola High School
Construction is completed on Atrium.